National Repository of Grey Literature 18 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Price of pipeline on various parameters of construction work
Sofka, Filip ; Pobuda, Štefan (referee) ; Aigel, Petr (advisor)
Bachelor’s thesis deals with price of utilities in dependency on characteristics of carried work flows. Theoretical part is based on price calculation, budget ,utilities and water supply problematics. In practical part is defined alternative option of watter supply construction, with realistic example.
Building CT Brno - rough substructure
Vlasák, Jakub ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of this bachelor´s thesis is the construction and technological salutions to rough substructure building Czech television in Brno. The content of this work is technological execution, solution to site equipment, design of machanical assemblies sonnected with transport links, checking and test plans, line budget, schedule, safety and protection of environment.
Residential Building
Uhlíř, Karel ; Šafařík, Martin (referee) ; Sukopová, Dáša (advisor)
Diploma thesis develops comprehensive documentation of the new building construction of residential house on the level of the implementation of the project construction. Proposal emphasizes layout of linked to ensure the technical design, structural, fire safety, protection against noise, energy saving, safety in use. Work is performed in an electronic format using AutoCAD and Microsoft Word (PDF Creator).
Construction technological project of sports hall construction
Tkáč, Jiří ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The thesis deals with Komenského Street sports hall construction in Lysá nad Labem. Although partially dealing with construction of all parts, in detail it studies gym construction, focusing on time management, technology and resources of implementation. The thesis is divided into the drawing and text parts. The former includes site facilities design and building situation. The latter consists of the main part construction project implementation study, itemized budget, time schedule, technological regulations, inspection and testing plan for the implementation of the main construction part 1st floor reinforced concrete columns and walls, construction machines and mechanisms design as well as time and financial schedule.
Technical infrastructure in cities
Hladůvková, Blanka ; Hluštík, Petr (referee) ; Vrána, Jakub (advisor)
This bachelor's thesis consists of three parts: Theory, calculation and project. Theory deals with possibilities of laying utilities into the ground, collectors, technical corridors, technical cannals, basement manifolds and to the overhead lines. Furthermore, the issue of coordination between utilities and greenery both in the Czech Republic and abroad is also addresed. The calculation part includes water demand, rainwater quantity and waste water balance calculations. Project contains the accompanying report, technical report and drawings. It focuses on the Jircháře street located in Staré Brno, where a new apartment building has already been built, for which new relocation of utilities from Jircháře street to Kopečná street had to be made.
The family house Ochoz u Brna, construction and technological stage gross substructure
Jakubcová, Monika ; Lízal,, Petr (referee) ; Biely, Boris (advisor)
This bachelor’s thesis is focused on technological execution of lower gross construction of family house in Ochoz u Brna. The content of this work is technological execution, solution to site equipment, scheduling, budget, design of machinery, checking and test plans, safety and protection of environment during execution relevant stage.
Sports hall in Třešť - technological phase of gross substructure
Navrátil, Ondřej ; Rotrekl, Ivo (referee) ; Henková, Svatava (advisor)
The subject of the bachelor thesis is the technology implementation of the gross substructure of sports hall in Třešť. This thesis includes the implementation of the pile sheeting wall, excavation works and the base on the foundation footings and strips. The thesis namely includes the solution of the construction site equipment, the situation of the construction with the transport routes solution, the technical report, the bill of quantities and the itemized budget, the technological instruction, the technical report of the construction site equipment, the schedule of work, the draft of the mechanical assembly, the control plan and the test plan and the occupational safety.
Apartment hotel
Prívara, Marek ; Mátl, Miroslav (referee) ; Hlaváček, Pavel (advisor)
The subject of this thesis was to develop project documentation for building construction. It is a new four-storey house with restaurant, situated on the outskirts of the village Bridges at Jablunkova. The building is brick, has a two-level gable and shed roof, consisting of wood roof system. Slope of the parcel on which the house is located, allows the building of the plant into the ground. Because of this it is possible to enter it, either the main entrance to the first floor or building around and over the summer terrace come directly to the restaurant on the second floor. Above it are two more floors for hotel guests only, a total of 10 accommodation units with its own bathroom.
Municipal Sports Hall in Kuřim - construction technology project
Vlasák, Jakub ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of this diploma´s thesis is the construction and technological salutions to rough construction building municipal sports hall in Kuřim. The content of this work is technological execution, solution to site equipment, design of machanical assemblies sonnected with transport links, checking and test plans, line budget, schedule, calculation of construction, building timetable, safety and protection of enviroment.
Construction technological project of sports hall construction
Tkáč, Jiří ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The thesis deals with Komenského Street sports hall construction in Lysá nad Labem. Although partially dealing with construction of all parts, in detail it studies gym construction, focusing on time management, technology and resources of implementation. The thesis is divided into the drawing and text parts. The former includes site facilities design and building situation. The latter consists of the main part construction project implementation study, itemized budget, time schedule, technological regulations, inspection and testing plan for the implementation of the main construction part 1st floor reinforced concrete columns and walls, construction machines and mechanisms design as well as time and financial schedule.

National Repository of Grey Literature : 18 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.